OO-S-256K/GEN
3.3 Codes and standards. The sewing machines shall comply with the applicable requirements of OSHA, NFPA, NEMA and UL.
3.3.1 Compliance. Prior to approval of the first article, if one is submitted, or prior to commencing production, the contractor shall submit to the contracting officer or his authorized representative satisfactory evidence that the machine he proposes to furnish meets the applicable requirements of OSHA, NFPA, NEMA and UL (where applicable).
3.3.2 OSHA. Acceptable evidence of meeting the requirements of OSHA shall be a certificate of compliance certifying that the sewing machines comply with the applicable requirements of 29 CFR 1910, including a belt guard and a finger guard or shield.
3.3.3 NFPA. Acceptable evidence of meeting the requirements of NFPA shall be a certificate of compliance certifying that the sewing machines comply with the applicable requirements of NFPA No. 70 for the wiring and installation of electrical components (except requirements for mounting shall not apply).
3.3.4 NEMA. Acceptable evidence of meeting the requirements of NEMA shall be a certificate of compliance certifying that the sewing machines, and motor starter enclosure comply with requirements of NEMA ICS 6, Type I and also that the sewing machine motors comply with the requirements of NEMA MG 1, when applicable.
3.3.5 UL. Acceptable evidence of meeting the requirements shall be a certificate of compliance that the sewing machine motors comply with UL
1004 and UL 508, when applicable.
3.4 Materials and components. The materials and components shall be as specified herein. Materials not specifically specified shall be of the quality normally used by the manufacturer for the specified equipment, provided the completed item complies with all the provisions of this specification (see 6.5).
3.4.1 Alternate materials and components. Components and materials offered as equivalents to those specified herein and on the applicable drawings shall be equal in form, fit and function to the specified component or material. The incorporation of such a component or material into the design of the specified sewing machines shall not require modification or change in location of any other component or material, unless such modification is specifically approved in writing by the contracting officer. The contractor shall submit with his bid for the contracting officer's approval, a list identifying each alternate material or component, together with proof that each listed component complies with
the requirements listed herein. Approval of the submitted listing, together
with the necessary supporting data does not relieve the contractor of the responsibility that these components or materials perform in accordance
4
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business